Skip to content

A Better Way – Project Case Study

Salem Family Aquatic Center

Background

Holland Construction Services served as general contractor for this outdoor aquatic facility which includes an 8,937 square-foot main pool, a 720 square-foot toddler pool, a large 3,000 square-foot bathhouse, mechanical building, and new drive and parking lot. Water features at the facility include a water slide, diving boards, play station with waterfall, and a lilypad walk, surrounded by extensive landscaping.

Leader Image

Ryan Savage

Project Executive, Education & Municipal

rsavage@hollandcs.com

618-975-3869