A Better Way – Project Case Study
Salem Family Aquatic Center
Background
Holland Construction Services served as general contractor for this outdoor aquatic facility which includes an 8,937 square-foot main pool, a 720 square-foot toddler pool, a large 3,000 square-foot bathhouse, mechanical building, and new drive and parking lot. Water features at the facility include a water slide, diving boards, play station with waterfall, and a lilypad walk, surrounded by extensive landscaping.
Holland has been very mindful of the concerns of the community and the administrative staff, and we have been very impressed with the quality of the construction management.
Thomas Christie (Former) City Manager, City of Salem
If you’re looking to bring a project to reality, we’d love to hear more about you and your company,